STA Consulting Engineers Logo

Toll Logistics Complex @ Arundel

2019
Hydraulic Engineering
Hydraulic challenges within a low water pressure area and high level of varied commercial water services required.

Case Study Details

Location

Logistics Place, Arundel, QLD

Builder

Toll

Designer/Architect

Completion Date

2019

Services Provided

Hydraulic Engineering

Related Case Studies

Warehouse, Truck Maintenance, Packing Facility & Office Complex

Scope:

Sanitary Drainage, Trade Waste, Potable Water Reticulation, Hot Water Reticulation, Gutter & Downpipe Specifications, Stormwater Management, Fire Services Design of Fire Hydrants & Hose Reels.


Challenges:

This Project was located within a low water pressure area and due to the level of varied water services required, it was important to provide sufficient site water storage to operational usage, with offset storage for fire services, pressurised through a single pump operation with varying pressure delivery to individual service areas.

Additionally, due to a large and reasonably flat roofing profile, the roof drainage system was required to be vigorously assessed in accordance with risk analysis, to ensure an effective, yet cost mitigating solution.

linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram